Reallin E3035 three-phase four-wire energy meter connected through current transformers, for active and reactive energy measurement. It is approved to MID and EN standards.
Current1(6)A
Frequency50Hz
Maximum TOU Rates8
TypeE3035
Voltage3X230/400V
Product overview
Three-phase smart energy meter E3035 by Reallin — The Reallin E3035 is a three-phase four-wire energy meter connected through current transformers (CT), approved to the MID directive and EN standard. It is designed for energy and power measurement on three-phase networks.
Measurement and recording. The meter measures active and reactive energy imported and exported, together with import and export maximum demand registers, with maximum demand calculated over a demand interval. It records historical energy and demand data, load profile and event log, and measures instantaneous parameters.
Tariffs. The meter supports up to 8 TOU rates and external tariff switching.
Communication and outputs. RS485 communication is provided, and an S0 pulse output is available for active and reactive energy. A synchronization function is also included.
Power supply and security. The meter has an auxiliary voltage supply, display when power is off and cover open detection.
Electrical characteristics. Voltage 3X230/400 V, frequency 50 Hz, current 1(6) A. Accuracy Kl.C and Cl.0.5 for active energy, Cl.2 for reactive energy.
Typical uses. This meter suits consumption monitoring and tariff management on three-phase installations, with data retrieval over RS485 to a supervision system.
Reallin E3035 three-phase four-wire energy meter connected through current transformers, for active and reactive energy measurement. It is approved to MID and EN standards.
Current1(6)A
Frequency50Hz
Maximum TOU Rates8
TypeE3035
Voltage3X230/400V
2. Datasheet extract (recorded values)
Parameter
Value
Accuracy
Kl.C, Cl.0.5 for active, Cl.2 for reactive
Current
1(6)A
Frequency
50Hz
Maximum TOU Rates
8
Type
E3035
Voltage
3X230/400V
Applications and use cases
Architectures in which 36058556 can play a role, derived from its category. This is not a compatibility statement: check the specifications against your requirements.
Energy bills give one total for the whole site. Submetering places meters and current sensors on each circuit or usage and collects their readings through a gateway, so consumption can be followed per building, floor or machine
To check
Number of circuits and phases to meter, and the current range of each
Wired Modbus bus or wireless LoRaWAN, depending on cabling access in the switchboards
Accuracy class required for internal allocation or for billing
Solar production, storage and charging points on one site are often managed separately. Inverters, batteries, MPPT controllers, meters and chargers form a local energy system that shares production between users
To check
Regulatory framework for collective self-consumption in the country
Energy management system steering storage and charging
Metering accuracy for sharing between participants
Associated system blocks
ProductionStorageMeteringCharging
Need a complete solution?
Send a request for 36058556 and the other parts of your project.
Similar parts to answer your needs. Compare the main characteristics. A recorded replacement is a documented relation; a similar product is a similarity only, never a compatibility claim.
What is recorded about the regulatory status and the life of this part.
Regulatory compliance
No compliance statement is recorded for this part. Ask the supplier for the RoHS and REACH declarations and, for a radio product, the EU declaration of conformity.
With your consent, we use Google cookies to measure the site’s audience and our advertising. Your quote basket and comparison stay in your browser either way. Details